Precast concrete manufacturer
Less steel with integer linear programming
I modeled joist production as an integer linear programming cutting stock problem and implemented the algorithm behind the optimal plan.
- Role
- End-to-end owner, from the mathematical model to the implementation
- Period
- 2020 – April 2021
- Stack
- PHP
- Operations research
- Integer linear programming
- Cutting stock
In 30 seconds
Problem
Short joists were made with the steel of long ones and offcuts piled up. That wasted the line's most expensive input.
Solution
I modeled it as a cutting stock problem with integer linear programming and implemented the algorithm that produced the optimal production plan.
Impact
Planning stopped relying on intuition. Each joist is made with the steel its length requires, and steel consumption went down.
Context
Each joist has steel inside, and the diameter of that steel depends on its length: the longer the joist, the thicker the steel. The plant had three production beds; each bed always produced three 33-meter rows at once, nine rows per day, which were then cut to the lengths demanded: about five different lengths, the longest around 10 meters.
The problem
When long and short joists were produced on the same bed, the short ones got the steel of the long ones: “super joists”, much stronger than needed. That excess of steel, the most expensive input, added to the leftover offcuts, which were also waste.
What I did
I owned this work from start to finish. I identified it as a cutting stock problem, which I had studied in Operations Research, and formulated it as an integer linear programming model: minimize the steel used, subject to meeting the demand for each length.
- I generated the cutting patterns. For each steel diameter, the combinations of pieces that fit in a 33 m row, given that a joist can carry steel equal to or thicker than it needs, never thinner. Only maximal patterns count: those that can’t fit another piece.
- I built the model. The variables are the number of rows cut with each pattern and the number of beds produced with each diameter. The goal is to minimize the cost of steel; the constraints are meeting the demand for each length and respecting that a bed always produces its three rows with the same diameter.
- I implemented the algorithm in PHP that solved the model and produced the optimal plan: how many beds to produce with each diameter and how to cut each row, with the least leftover and the least steel waste.
A detail the model finds on its own: a single objective function penalizes both oversized steel and offcuts, since you pay for the steel of the whole row. But it can tell when it pays to use a leftover with an oversized joist: in the demo scenario, cutting 3 × 10 m + 1 × 3 m costs the same as 3 × 10 m and delivers one more joist.
Results
- Planning stopped relying on intuition.
- Each joist is produced with the steel its length requires.
- Consumption of the most expensive input on the line went down.
An example with numbers
For the demo I built an example with five lengths based on common commercial sizes, extended up to 10 m, and a demand of 465 joists. The numbers are illustrative, not measured at the plant: the optimal plan uses 24 beds (8 production days), sits just 4% above the theoretical minimum of steel, and uses about 37% less steel than filling the beds in the order joists arrive.